Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Cao Kelly
  • Company Name : Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.
  • Tel : 86-373-5939771
  • Fax : 86-373-5461565
  • Address : Henan,xinxiang,Yulin village Yanjin county
  • Country/Region : China
  • Zip : 453000

Vibration Motor

Vibration Motor
Product Detailed
Related Categories:Other Motor
vibro motor: 1.Delivery time:10-20days 2.ISO9001:2000 3. Have the stable amplitude 4.Standard wooden cases

                                                      Vibro Motor

The structure and working principle

Vibration motor is power and vibration source of combination of excitation source, vibration motor is installed in the rotor shaft at each end of a group of adjustable eccentric block, using axle and eccentric block high-speed rotating produce centrifugal force get excitation force. Vibration motor excitation force is high efficiency, energy consumption is small, low noise and long life. Vibration motor vibration force can steplessly adjust, use convenient, JZO, YZU, VB, XVM, YZO, YZS, YZD, TZDC TZD, such as type of vibration motor is general-purpose vibration motor. Can be applied to general vibratory machines, such as: vibration sieve crusher, extension, vibration dozen charter flights, vibration falling pressure-blasting machine.

Characteristics

1.Excitation force and power, cooperate proper vibration is big, the body is light weight, small size, machinery and low noise

2.Has the stable amplitude

3.Vibrational frequency range

4.Many units close, can realize self synchronous can complete different process requirements

5.According to the vibration motor installation way of changing the direction of excitation force

6.Simply adjust an eccentric block Angle, can steplessly adjust excitation force and amplitude

7.Maintenance simple

8.many specifications

Installation,

Vibration motor and vibration of mechanical connection plane roughness are for 3.2 or higher

(1), winding insulation, such as damp should adopt corresponding method processing 500V ZhaoOuBiao check winding insulation resistance, near working temperature (70 °C), shall not be lower than the 0.38 trillion ohms for 380-volt ac, otherwise should undertake drying processes.

(2), cable is in good condition, such as happening ruptures breakage should change in time.

(3), the body is in good condition, if has the damage please contact us to change.

Will vibration motor installed in vibration of mechanical vibration motor, the anchor bolts must tighten, each nut must add elastic gasket.

Vibration motor at the beginning of operation because of bolts, nuts, base plane between adjust, can reduce fastening force, appear small loose, reason should be run early motor anchor bolt many times a day at first tight and tighten once, after two weeks weekly scrutiny tighten once.

Install regular neurobics regimen, in the body and basis, all should have cable pressure device, between cables are naturally shape, the total length of suspension with 300-500mm advisable, natural overhang of curved radius of two reference line vibration equipment vibration motor when working at the same time, should check whether the two vibration motor turns in the opposite. Or should be changed by an electric motor power sequence, make two vibration motor steering instead, to ensure material of uniform trend.

Vibration Motor



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.